    hi
    if we stop our ESS Scheduler Managed Servers for any length of time, when they are brought back they retrospectively trigger jobs. Is there a way to change this behaviour so that the schedulers will only pick up on the next schedules as opposed to trying to run all those missed during the outage?

    For example - we have a schedule that fires every 2 minutes. If we bring down ESS Managed Servers at 12:00 until 14:00 - once the servers are back up with their current configuration, the scheduler will trigger each of the jobs in the 12:00 to 14:00 outage window. Is there a way to get the scheduler to pick up the next schedule after the server has resumed - for example 14:02?
    Thanks