1. Get rid of all advertisements and get unlimited access to documents by upgrading to Premium Membership. Upgrade to Premium Now and also get a Premium Badge!

UCM Collaboration Project (Criteria Workflow) issue!

Discussion in 'Oracle Webcenter Suite (formerly Oracle ECM)' started by gruru, Feb 4, 2010.

  1. gruru

    gruru Active Member

    Messages:
    1
    Likes Received:
    0
    Trophy Points:
    75
    I'm new at UCM and I'm looking for any kind of advice about this particular issues.

    I have a scenario that goes something like this:

    1. doc1 of type 1 is checked-in
    2. doc2 of type 2 is checked-in
    3. doc3 of type 3 is checked-in but only after the doc1 and doc2 are entered
    4. according on an evaluation (metadata field) of doc3 -> doc4 of type 4 is entered!
    5. doc4 is sent to a user for an approval
    6. after user approves doc4 -> doc5 of type 5 can be checked-in
    7. doc5 is sent to a user for an approval

    ...

    I am trying to obtain this functionality that can perform these steps in some sort of sequence.
    What would you suggest me? Should I use Collaboration Projects - with criteria workflow
    (so that I can group these content under single "register")?! or something else!

    I was trying to to this with Collaboration Projects and Criteria WF but I cant seem to make content (checked-in from a project) enter the workflow!

    Documentation seems to say that I'm suppose to use initialization script in a entry point of Criteria WF (for a Collaboration Project) but I can't seem to find this script in a system!
    <$exec inc("prj_token_init_script")$>

    (where can RelatedContentManager be obtained and could it be integrated in a scenario above)