How to schedule the concurrent Manager

Discussion in 'Oracle Apps Technical' started by juan, Apr 12, 2009.

  1. juan

    juan Active Member

    Messages:
    18
    Likes Received:
    2
    Trophy Points:
    90
    We are in the process of migrating data from a legacy system to a new oracle apps module. I have imported data into Oracle database tables through SQL Loader by running a Concurrent request at a scheduled time.

    Can I run the concurrent requests to import data as soon as the data file
    is sent from the legacy system. I cannot schedule the Concurrent Manager
    to run at a specific time as i will not know when the data file is being sent, Is there a way to automatically run the Concurrent Manager as soon as the data file is sent from the legacy system?
     
  2. apps_expert

    apps_expert Forum Expert

    Messages:
    325
    Likes Received:
    28
    Trophy Points:
    330
    Location:
    Chennai, India
    If you want to start the concurrent request after receiving the files, the best way to achieve this is to build a shell-script that polls for the files, and kicks off the sql*loader when the files arrive. If the processing has to be done in a concurrent request, you can kick off a request with concsub.