Can ascp (using sds) respect the changeover as provided by legacy system and not re-calculate?

Discussion in 'Oracle SCM & Manufacturing' started by VCP_Sumit, Aug 23, 2016.

  1. VCP_Sumit

    VCP_Sumit Starter

    Messages:
    1
    Likes Received:
    0
    Trophy Points:
    10
    Location:
    NJ
    Hi Gurus,


    Background

    We are implementing VCP with a legacy ERP (on AS400). In order to satisfy the Changeover requirements, we are providing the data in the table MSC_ST_SETUP_TRANSITIONS. We are running the plan using SDS.


    Issue

    So if we have a transition from Item A --> Item B for 4.5 Hrs, ASCP is recalculating this changeover based on the combination of A-->B, B -->C etc.


    Question

    Is it possible for ASCP to honor the value of 4.5 as provided directly by the users and no re-calculate?

    The users on the floor know exactly what they are providing and therefore do not want the system to use any smart algorithm to use a different changeover duration.


    Thanks